Correcting Violations and Pulling Permits

E-mail Print PDF

For your convenience, we maintain strong relationships with the following Agencies to ensure prompt, reliable service when a violation needs to be corrected or permits need to be pulled.

FDNY

  • Sprinkler
  • NY Color Code
  • Annual sprinkler test
  • Monthly Visual Inspections
  • Standpipe
  • Residential Flow Test
  • Existing sprinkler systems must be 'flow tested' by a licensed plumber or licensed fire suppression contractor once every 30 months - an FDNY inspector must be present once every 60 months - to ensure the water pressure at the sprinkler head farthest from the water meter is greater than 15 PSI.

HPD

  • Violation removal

DEP

  • Installing water meters
  • Correcting violations
  • Boiler registration
  • RPZ or Back Flow Device

Department of Buildings

  • LAA Filing
  • Work without a permit
  • Boiler inspection
  • OP-128 Filing

Con Ed & National Grid Gas Shutdowns

  • Gas leaks
  • Restoring service